Assigning shifts to schedules
Note:
Schedule Builder uses the shifts you assign, combined with the employees’ availability and shift assignment, to schedule shifts (or variations of them).
To assign shifts to schedules
- Click the Configuration tab.
- In the Schedules group, click Schedule.
- In the left pane, click Assignments.
- In the right pane, click the Shifts tab.
- Under Schedules, select the schedule to which you will add shifts.
- Under Fixed Shifts, select the fixed shift to add to the schedule.
- Click > to assign the shift to the schedule.
- Under Variable Shifts, select the variable shift to add to the schedule.
- Click > to assign the shift to the schedule.
- Repeat steps 6-9 for each shift you want to add to a schedule.
- Click OK.
↑